The Minister of the Interior may grant a permit only if the Immigration Control Board confirms that the applicant falls under one of the following categories and meets the necessary criteria. (a) Farming. He possesses adequate land or a permit to acquire it and at least CYP250.000.(b) Mining. He possesses a mining permit and at least CYP200.000. (c) Trade. He has capital of at least CYP150.000,(d) Retirement. He has a secure income of about CYP5.000 per person and he and hid dependants will not work.
In these circumstances, promises and the willingness of locals to help may meet the Authority’s objections. A more serious consideration however is section 4A of the Streets’ and Buildings’ Regulations. This amendment of the Law states that, in certain cases, no building permit will be granted to plots of land which are the result of field subdivision. Therefore, the derivation of the site’s title must be examined and verified by the District Lands’ Office.
The next step is to appoint an architect to carry out the design. There is an abundance of well qualified architects on the island and many capable technicians as well. We suggest that you appoint an architect for the purpose (not an engineer or technician). Architect fees range from 4%-6% (on the building cost) but you can agree also on a fixed fee. The prevailing fees are 3.8% on the building cost for a complete set of architectural plans and 1.6% for supervision (including the issuing of certificates).
With the increasing complexity of the property market and the constant introduction of new concepts and measures new for the island (although not so in the European countries) it is advisable that the potential purchaser seeks professional advice prior to concluding a deal in order for hardships and disappointments to be avoided. This advice is specially useful to the foreign purchaser who has to encounter the problem of different laws and local attitudes. For this reason this firm has prepared the following tips which may be useful to the local property purchaser.
It is recommended that a building permit be secured first before works commence, although works such as excavations etc may begin prior to the issue of the building permit. In this case, your architect must consult with the Appropriate Authority to see whether there are any major objections to the drawings.